• AusatKeyboardPremi@lemmy.world
    link
    fedilink
    arrow-up
    3
    ·
    15 hours ago

    I am an ardent believer in it, given how many times it has saved our assets at work, often to the point of annoying people. That said, I usually end up being right for insisting on more time and/or data, so it’s all good.

    However, my spoonerific brain always gets this twisted to “measure once, cut twice”.

    I unknowingly wrote this once in a comment about asking for more metrics during a design review.

    My colleague (the author of said design document) replied with the relevant metrics and a comment saying “measure never, cut forever”. :D